FAQs - General
-
Do I have to do both Design and Build with MILEHAM?
No you do not. MILEHAM has a 100% flexible Service model for our Clients. This means you have the option to engage us for:
Architectural Design only - and use your own preferred builder
Custom Home Build only - we will build from your approved plans designed elsewhere
Design and Build - engage us to do a complete Architectural Design and Custom Home Build project
Our pricing model remains the same, no matter which Service model you choose. We do not require you to confirm upfront if you want to do a Design and Build - you can engage us for Design Only, and decide later on down the track if you would also like us to undertake the Build for you.
-
Do you service Clients outside of Sydney?
Yes we do - although only for our Architectural Design services.
We have Clients as far North as Tamworth, as far West as Orange, and as far South as Bowral and Wollongong. We meet with all our non-Sydney Clients both face to face, and via Zoom.
-
What is the NCC?
The NCC - National Construction Code - is an important regulatory framework that governs the design, construction, and performance of buildings and drainage throughout Australia.
Volumes One and Two of the National Construction Code combine to create the Building Code of Australia (BCA), which contains specific provisions around project design and construction.
You can read more about recent changes made to the NCC, and what they mean for your home renovation or new build, here.
-
What Consumer Protections do you have in place for me?
Ensuring our Clients feel safe with MILEHAM is of upmost importance to us. We understand that undergoing a major renovation or a new home build is one of the biggest things you will ever do. We want you to feel safe in the knowledge that we - and all of the bodies we must comply with - have your back, both personally, and financially. Here is how we keep you safe:
MILEHAM’s Architectural Registration affords you consumer protections we must comply with, as determined by the NSW Architect’s Registration Board, a Board which is regulated by the NSW Government’s Architect’s Act 2003.
MILEHAM’s Builder Licence affords you consumer protections we must comply with, as regulated by NSW Fair Trading.
We have Professional Indemnity Insurance and Public Liability Insurance for every one of our design and/or build projects.
We take out HBCF Insurance (see below) for every custom home building project we undertake.
We provide every Client with additional detail on all of the above, when you engage with us.
FAQs - Architecture
-
Is MILEHAM an Architect? A Draftsman? Or a Building Designer?
MILEHAM is a fully qualified and formally Registered Architect (Nominated NSW Architect James Pilcher NSW ARB No. 10030) registered with the NSW Architects Registration Board. We are also an A+ Member of the Australian Institute of Architects.
You can read more about the difference in qualifications, consumer protections, and service you receive between an Architect and a Draftsman/Building Designer, here.
Our Founder and Principal Architect, James Pilcher, is also a fully Licensed Builder. This rare skill set provides our clients with a comprehensive design, build and cost solution when engaging with MILEHAM.
-
How much does MILEHAM charge for Architectural Designs?
MILEHAM charges a Fixed Price for our Architectural Designs, based on the Scope of Works and level of design complexity required for your project. Our Fee covers all Five Stages of our Design Process.
Our Fee Proposal does not include fees from external Specialist Consultants or Planning Submission fees. These fees will be quoted and invoiced directly to you by those relevant parties.
-
What are the Stages of MILEHAM's Design Process?
Our Design Process is broken up into five core Stages:
Detailed Brief
Concept Design
Design Development
Planning Submission
Construction Documentation and Construction Certificate
Read more about our Design Stages.
-
How long does the Architectural Design Process take?
Most people are surprised by the timeline from when you sign an Architectural Design Fee Proposal, to when you receive your final Construction Documentation and Construction Certificate and can thus commence your build.
We’ve outlined a general timeline below, however please note these timings can alter depending on the Scope of your Brief, and timings as advised by your Local Council/Private Certifier and external Specialist Consultants:
Detailed Project Brief: 2 weeks (allow an additional 2 weeks here if you need to arrange a Site Survey)
Concept Design: 12-16 weeks
Design Development: 12 weeks
Planning Submission: 8 weeks (plus assessment period as advised by your Local Council or Private Certifier)
Construction Documentation and Construction Certificate: 12 weeks
Read more about the Architecture Planning Process.
-
What are Specialist Consultants?
Engaging Specialist Consultants (in addition to your Architect) is a necessary part of undergoing a home renovation or new home build.
The Consultants you will need to engage for your particular project will depend on factors such as your project scope, your site and its local environment, your local council planning guidelines, and whether you already have at hand some of the documentation required (e.g. the previous owner may have undergone a Site Survey before they sold the house to you).
-
How much should I budget for Specialist Consultants?
The prices below are a guide only, however should be included as part of your overall Project Budget.
Remember, you may not need to engage all of these Consultants for your particular project. MILEHAM can advise you on which Consultants you will likely need to engage:
- Town Planner c.$2,000
- Heritage Advisory Consultant c.$5,000
- Site Surveyor c.$2,500
- Storm Water Engineer / Hydraulic Engineer c.$3,000-$5,000
- Structural Engineer c.$3,000-$5,000
- Geotechnical Engineer c.$1,000-$1,500
- Arborist c.$1,500-$2,000
- Bushfire Consultant c.$750-$1,500
- Private Certifier c.$3,000-$5,000
- Quantity Surveyor c.$1,500 (MILEHAM prepares Build Cost Estimates as a part of our Architectural Design services, and as such saves you from having to outlay a fee for a Quantity Surveyor)
-
How much are Planning Submission fees?
You should budget up to $4,000 to pay for submission of your plans to your local Council (for DA) or Private Certifier (for CDC) for their review and approval.
You should also budget around $10,000 for authority charges, a (refundable) security bond, and a Long Service Levy. The specifics of these charges will be outlined in the consent letter you receive from Council or your Private Certifier once your plans are approved, and invoiced by the relevant third party.
-
Does MILEHAM manage the DA or CDC approval Stage?
Yes we do! On behalf of our Clients, we submit Architectural Plans to Council (DA) or to a Private Certifier (CDC), and manage any subsequent requests from those bodies for additional information or documentation. This service is provided as a part of our Fee Proposal (Stage 4).
As a part of this Service, we also co-ordinate all the external Specialist Consultants who are required to submit Documentation as a part of your DA or CDC. All you need to do is sit back, relax, and let us take care of the complexities and time investment required at this Stage.
FAQs - Custom Home Building
-
Is MILEHAM a Licensed Builder?
Yes - MILEHAM is a professional Licensed Builder: 272736C. We are a multi-award winning Member of the Master Builders Association of NSW, and are also a Member of the Association of Professional Builders.
You can read more about the importance of working with a professional Master Builder here:
-
Will you Build from my own Architect's or Draftsman's plans?
Yes we will. MILEHAM has a 100% flexible service model, meaning we provide our construction services not only for our Architectural Design Clients, but also for Clients who have sourced their designs and approved plans elsewhere.
-
Does MILEHAM provide Fixed Price, or Cost-Plus Contracts?
MILEHAM offers detailed Fixed Price Contracts on our custom home building projects to allow more transparency and dependability for our clients. Our Building Quotes are valid for 30 days and, once approved with your deposit paid, construction begins within 3 months.
You can read more about Fixed Price vs. Cost-Plus Contracts here:
-
What's the difference between a Build Quote and a Build Estimate?
A building estimate is a ballpark figure based on what you want to achieve e.g. you want to extend the back of the house into a open kitchen/living, renovate the front bedroom and add a pool. Estimates don’t require a builder to go away and calculate every material and fitting, but they do help you confirm if what you want is generally within your budget. Estimates are usually about a page long and don’t cost you anything as no detailed work or planning has been undertaken by the builder.
By comparison, a building quote should be between 25-40 pages, specify every inclusion, and detail the amount of materials and labour required for the duration of your project. Pulling together a proper quote can take up to 40 hours and involves contacting subcontractors for quotes and creating a lengthy and detailed job schedule.
You can read more about the difference between a building quote and estimate here.
-
What is a Construction Certificate (CC)?
Not to be confused with an Occupation Certificate (see below), a Construction Certificate (CC) must be attained before you start construction on your project. This certificate is applied for after you have received your DA or CDC approval. It essentially confirms that the construction plans and development specifications are consistent with your approved plans, and that they comply with the Building Code of Australia.
MILEHAM applies for the Construction Certificate on behalf of all our Clients. This service is included as part of our Design Fee Proposal.
-
How much are Construction Certificate fees?
To obtain your Construction Certificate, you should budget:
Around 1% of your Build Cost Estimate (submitted with your DA/CDC) for your local Council Development Contribution (not all Councils require this Contribution, and fees can vary within the same Council area).
A $2,500-$3,000 security bond to cover any potential damage to public assts during your build. This bond is refunded upon completion of your build, pending any damages.
A Long Service Levy of 0.25% of the Build Cost Estimate (BCE). This fee only occurs when your BCE is over $250,000.
The specifics of these charges will be detailed in the consent letter you receive from Council or your Private Certifier once your plans are approved, and invoiced by the relevant third party.
-
What is a Provisional Sum (PS)?
A Provisional Sum (PS) is a rate or allowance specified in a building quote when there is an unknown quantity or task required in order to complete your home renovation or new home build. PS’s cover labour only, or labour and materials. They are used when either:
Final selections have not yet been made (e.g. you have not yet chosen the timber - and thus can’t know the price - for your staircase), or
When it is simply not possible to include a price in the quote due to factors that can only be uncovered once construction actually starts (e.g. a set rate per square meter for asbestos removal during demolition).
Provisional Sums are thus estimates within your quote, which means they often change when the final cost of the task is calculated.
Upon receiving a building quote, always check if your builder has filled your quote with PS’s or confirmed costs. An experienced and professional builder will have minimal PS’s in their quote.
Builders who rely on PS’s are typically disorganised and are not prepared to put in the time to quote your job properly. It’s a big red flag and increases the chances you’ll be taken advantage of. Typically these builders include unrealistically low provisional sum allowances in their quote so that their prices appears lower than their competitors. These builders know that if there was any error in the final costs, they will be passed directly onto you.
-
What is a Prime Cost (PC) item?
Much like a Provisional Sum (PS), a Prime Cost (PC) item is a dollar figure allowance used in building quotes and contracts to allow for items such as appliances, sinks, taps, etc., where the final selection of those items is still to be confirmed.
The allowance for a Prime Cost item only covers the supply of that item. Any labour associated with the installation of that item should either be included in the contract or listed separately as a Provisional Sum (PS).
Just like Provisional Sums, Prime Cost items do change depending on your final selection and therefore can incur additional costs. So in order to minimise your exposure to budget overruns, make your selection choices prior to signing a contract (where possible).
-
What's an Extension of Time (EOT)?
An Extension of Time is the amount of days added to your building contract’s timeline as a result of:
A variation added by you, and/or
Inclement weather or any other reason outside the builder’s control
EOTs simply extend the contract completion date of your renovation or new build, from what was originally recorded in your building contract.
-
What's a Variation?
Variations can introduced for many different reasons, the most popular being when you change your mind on something after the contract has been signed (e..g you decide to add a bathtub to your bathroom).
Variations document what has been changed along with any additional costs that relate to labour, materials and administration fees.
Variations can also be incurred when any unforeseen work arises, which is typical of renovations and extensions. If there was no way of knowing about a certain issue at the time of quoting your project, it’s simply an unforeseen variation that needs to be raised so the builder can do the necessary work.
Each time a variation is raised, these typically come with an extension of time attached to them.
-
What is a Rock Clause?
A rock clause can be found in most building contracts, typically fixed price contracts. It’s there to protect a builder from unfortunate, unforeseen circumstances like hitting rock during excavation.
-
What is an Occupation Certificate (OC)?
Not to be confused with a Construction Certificate (see above), an Occupation Certificate (OC) is a certificate which authorises the occupation and use of a new building or home, or outlines a change of building use for an existing building in accordance with its consent.
-
What is the Home Building Compensation Fund (HBCF)?
In NSW, the Home Building Compensation Fund (HBC) (formally known as the Home Owners Warranty Insurance - HOWI) provides a safety net for home owners faced with defective building work and non-completion of that work carried out by a builder or tradesperson.
By law, a builder must take out insurance through the HBCF on residential work over $20,000, before starting any work or taking any money under the contract, including the deposit. On average, HBCF costs around 1% of the value of your build. The insurance is usually arranged for by the builder, and paid for by the home owner.
Insurance under the HBCF covers:
- All major defects for six years after the work is completed.
- All other defects for two years after the work is completed.
- Loss arising from non-completion of the work (the homeowner must make a claim within 12 months of the failure to commence, or cessation of, the work).
The total limit (including non-completion of building work, defective building work, and any other costs covered by the policy) is $340,000 per dwelling, with a sub-limit for incomplete building work of 20% of the contract price. You can read more about HBC here.
MILEHAM takes out HBCF for every residential construction project we undertake. The cost for your HBCF is included in MILEHAM's Build Quote. Once issued, we supply you with a copy of your HBCF Certificate of Insurance (COI) for your records. This record is verified for you by the HBCF Check.